LogoBanner
Banner
Printer Friendly
Email Page
Site Search

Go To Site Search
 
 

Utility Department - Wastewater / Stormwater

9805 Overseas Highway

Marathon, FL 33050
305-289-5005                                         After Hour Emergencies Call (305) 747-0387


 

IF YOU SUSPECT A LINE BREAK OR LEAK CONTACT: (305) 289-5009 OR (305) 289-5005

CONTACT INFORMATION

Contact (305) 289-5005 for:

§         To Report Sewer Problems

§         To Report Sewer Odor

§         New Sewer Connections

§         Billing Questions

§         General Questions

§         To Report Manhole Vandalism

§         Schedule Plant Tours

 

Contact (305) 289-4115 for:

§            Sewer/Stormwater Line Locations

§            Stormwater Pollution Prevention

MISSION

In order to protect and improve the quality of our near shore waters for boating, fishing, snorkeling and diving, the City of Marathon initiated a major wastewater and stormwater improvement program.  These improvements will improve water quality, protect public health and enhance the City's economic vitality.

The Utilities Department will provide the most cost effective and reliable stormwater and wastewater facilities and services to the residents of the City of Marathon. 

OVERVIEW

The Utilities Department functions include maintaining stormwater structures and lines, several wastewater treatment facilities including buildings, equipment and force main and vacuum collection lines, reclaimed water systems, biosolids/sludge management, well monitoring and injection systems, fuel tanks and vehicles, telemetry, odor control systems, permit compliance, budgeting and reporting.

RATES

In accordance with Resolution 2009-60, the monthly wastewater operation and maintenance base facility fees include a per customer charge of $14.19 plus a capacity charge of $21.78 per Equivalent Dwelling Unit (EDU).  The base facility fees will begin within thirty (30) days of the date of the “Connection Notice.”  The volumetric charge is $8.04 for every 1,000 gallons of metered water used.  These fees will begin within sixty (60) days from the date that a property owner receives a “Connection Notice” from the City.

CONSTRUCTION SCHEDULE

The City’s wastewater and stormwater program is being constructed in 7 service areas which include a wastewater treatment plant and the collection system.  The following is the anticipated construction completion schedule as of March 2010.

 

SERVICE AREA

LOCATION

ANTICIPATED COMPLETION

1

Knights Key

TBA

2

NA

NA

3

11th Street to 39th St

July 2010

4

39th St to 60th St, including Sombrero

May 2010

5

60th Street to Vaca Cut

April 2011

6

Vaca Cut to Cocoplum Dr

April 2010

7

Grassy Key

May 2011

 

For the detailed construction status report provided by Weiler Engineering, please click here.