- A request may be submitted, in writing, by phone, or in person to:
City Clerk’s Office
The City of Marathon
9805 Overseas Highway
Marathon, Florida 33050 - Email cityclerk@ci.marathon.fl.us or you can also fill out an online public request form here: Public Record Request.
The request should include as much information as possible; the specific type of record or information you wish to review; the tax or parcel identification number of the property; information in which we can contact you to let you know when your request is ready.
Requests are processed in the order they are received and as soon as possible; however, more time maybe required due to the nature of the request or the number of requests currently being processed.
Owner-Builder Affidavit
Permit Fee Schedule
A time specific inspection may be requested, but must be approved in advance. Time specific inspections are subject to a $150 inspection fee, which must be paid prior to scheduling the approved time specific inspection.
You may schedule your inspection one of the following ways:
- Online through the City of Marathon Permitting Portal
- Email your request to inspections@ci.marathon.fl.us
- Call directly to our inspection phone line (305) 289-4133 and leave a message.
- Permit Number
- Type of inspection needed
- Date the inspection is to be performed
- Address of job site
- Contractor Name
- Onsite Contact Person’s Name and Phone Number
- Details pertaining to the inspection such as permit card location or gate codes.
In order to expedite the inspection, contractors and/or homeowners are asked to ensure that the building is posted with clearly visible numbers for identification.
A time specific inspection may be requested, but must be approved in advance. Time specific inspections are subject to a $150 inspection fee, which must be paid prior to scheduling the approved time specific inspection.
If the inspection requires the inspector to enter your building or there are animals on the property, someone must be there to meet the inspector.
For all owner/builder permits, the owner must be present for all inspections.
Inspection results are entered into the online permitting portal by the end of the day. Online Permitting Portal
You can follow the procedures detailed here to locate the results: Frequently Asked Questions
Extension Request Form
See procedures for submitting in the FAQ section of the portal: Frequently Asked Questions
Electric Meter to Power Up Affidavit
A Certificate of Occupancy is required when a new building is constructed, or if a change is made in the occupancy, nature or use of an existing building or part of a building.
Option #1
If the project is not complete or not approved, then the property owner may retain the original contractor or hire a different contractor appropriately licensed to perform the work and obtain required inspections to close the permit. The permit would first need to be reinstated as a permit must be active for work and inspections to take place.
Option #2
The owner may assume the role as an owner-builder to complete the permit and obtain required inspections, only if the meet the owner-builder requirements as per F.S. 489.103(7). The permit would first need to be reinstated as a permit must be active for work and inspections to take place.Option #3
If permit is expired and work is complete, permit may be reinstated and a signed and sealed engineer letter will be required to certify that the work was completed to code.